Index of /SISTEM MANAJEMEN/2. SISTEM MANAJEMEN TERINTEGRASI PT. CINT/KLAUSUL 4. KONTEKS ORGANISASI/4.3 SISTEM MANAJEMEN MUTU DAN PROSES/1. SISDUR MANAJEMEN MUTU (ISO 9001)/9. QC/1. Prosedur-IK
Name
Last modified
Size
Description
Parent Directory
-
~$5.0. Prosedur Pengendalian produk Tidak Sesuai (up date).doc
2022-02-23 13:10
162
~$6.IK.3. Instruksi Kerja Pengujian Terhadap Barang Kadaluarsa (Powder Coating)-1.docx
2022-02-23 14:20
162
~$8.0. Prosedur Tindakan Koreksi (up date).doc
2022-02-23 15:48
162
~$10.0 Prosedur Teknik Statistik (up date)-1.docx
2022-02-25 07:44
162
~$15. P.9.0. Prosedur Tindakan Pencegahan.docx
2022-03-02 11:10
162
1.19. P.11.0. Prosedur Penilaian Kinerja Sub Kontraktor (up date).docx
2023-11-07 13:22
79K
1.4. P.4.0. Prosedur Status Inspeksi dan Test.docx
2023-11-07 12:50
85K
1.3. P.3.0. Prosedur Inspeksi Pengetesan Produk Jadi.docx
2023-11-02 16:50
90K
1.5. P.5.0. Prosedur Pengendalian produk Tidak Sesuai.docx
2023-11-03 11:11
94K
1.2. P.2.0. Prosedur Inspeksi Pengetesan Selama Proses_ISO_2015 ( Update 03 des 2019).docx
2024-07-11 08:00
129K
1.1. P.1.0. Prosedur Inspeksi Pengetesan Penerimaan (up date 12 Juni 2024).docx
2024-06-13 08:56
146K
1.11. P.7.0. Prosedur Pengendalian Alat Inspeksi, Ukur dan Uji (Revisi 1 April 2025).docx
2025-05-06 13:30
151K
1.1. P.1.0. Prosedur Inspeksi Pengetesan Penerimaan.pdf
2024-10-04 09:27
219K
1.5. P.5.0. Prosedur Pengendalian produk Tidak Sesuai.pdf
2024-10-04 09:36
235K
1.11. P.7.0. Prosedur Pengendalian Alat Inspeksi, Ukur dan Uji (Revisi 28 Nov 23).docx
2023-11-29 14:21
412K
1.7. P.6.0. Prosedur Pengetesan BB, Komp, Prototype & Prod. Jadi (Revisi 28 Nov 2023).docx
2023-11-29 14:13
711K
1.7.P.6.0. Prosedur Testing (Revisi 1 April 2025).pdf
2025-07-09 10:05
1.5M
1.7.P.6.0. Prosedur Testing (Revisi 1 April 2025).docx
2025-07-09 10:04
4.3M
Apache/2.4.66 (Ubuntu) Server at karir.chitose-indonesia.com Port 7777